Ticket Progress

2026-07-15 · scope valter workspace (Code/valter) · window 14d
CEO status view for Valter · myImaginationAI · adb state as of 2026-07-15 19:57 · refreshed by session ai-dev-brain
This is the single unified view — any session regenerates it in place (see the ticket-progress-report / session-coordination norm).

Snapshot

25
Total
3
In progress
2
Blocked
9
Done
11
Backlog
Backlog 11 (44%) In progress 3 (12%) Blocked 2 (8%) Done 9 (36%)

Active sessions (team)

SessionFocusStatusNext
ai-dev-brain Shipped adb ad-hoc ctrl+shift+` Windows fix (#230, Jenkins #42 green); grew + unified the ticket-progress-report skill active Canonical report = one view; any session regenerates it in place
higgsfield-venture Fixed Higgsfield CLI (Windows tar bug); de-hype deep-research; harvested ~14 AI-hustle/content TikToks toward a my-imagination-ai Perth content-agency active Ingest corpus→topics, create venture ticket+wiki; USER: buy Plus + higgsfield auth login + approve outreach
obsidian Fast Obsidian junction-vault; built the session-coordination skill + SessionStart hook active Dogfood — next session should see its line injected at startup

Source: wiki/live.md "Active sessions". The team builds on the shared adb tickets + this board; any session refreshes this one report from that shared state.

Needs attention

  • 🔴 TASK-00011 blocked 69h (threshold 24h) — FIFO concierge MVP for 1–2 subs
  • 🔴 TASK-00017 blocked 47h (threshold 24h) — Questionnaire concierge MVP for 1–2 vendors
  • 🟡 TASK-00005 in progress 123h (threshold 72h) — Serena semantic-nav spike
  • 🟡 TASK-00002 in progress 120h (threshold 72h) — Wire PMF survey capture
  • 🟢 Backlog has 11 tasks (threshold 10)

Initiatives & stages

InitiativeStageTicketsDone
AI Property Insights · org homeward MVP 1 0 / 1

Only TASK-00002 is associated to an initiative; the other 24 tickets are unassociated.

Progress by org

OrgDone / totalProgress
valter-silva-au/ai-dev-brain3 / 475%
_local6 / 2129%

Activity (14d)

Since 2026-07-08: 25 tickets created, 8 completions recorded in-window, and 1 stage advance (ai-property-insights Idea→MVP, human override — an onboarding demo). Two validation tracks were spun up: Questionnaire-SaaS (TASK-00015–19, Jul 12) and Vibe-to-Prod (TASK-00020–24, Jul 14).

The event feed was read as a head-limited sample, so this reflects visible events, not a complete census; completion count is of status→done events seen in-window.

Tickets

In progress (3)
TASK-00002
Wire PMF survey capture
in progressP2
initiative: ai-property-insights
in progress 120h (past 72h threshold)
TASK-00005
Test Serena semantic navigation on adb
in progressP2
owner: valter · github.com/valter-silva-au/ai-dev-brain
branch chore/test-serena-semantic-navigation-on-adb
worktree: dirty · behind 15 · in progress 123h
TASK-00010
FIFO SaaS validation: 8–10 ICP interviews (WA mining subs)
in progressP1
owner: valter
Blocked (2)
TASK-00011
FIFO SaaS validation: concierge MVP for 1–2 real subs
blockedP2
owner: valter
blocked 69h (past 24h threshold)
TASK-00017
Questionnaire SaaS validation — concierge MVP for 1–2 real vendors
blockedP2
owner: valter
blocked 47h (past 24h threshold)
Backlog (11)
TASK-00012
FIFO SaaS validation: synthesize + go/no-go gate
backlogP1
owner: valter
TASK-00013
adb: quote title in per-ticket status.yaml serializer
backlogP2
owner: valter
TASK-00014
Questionnaire automation SaaS for SMB B2B vendors (PRD)
backlogP1
owner: valter
TASK-00016
Questionnaire SaaS validation — 8–10 ICP interviews (AU/APAC B2B vendors)
backlogP1
owner: valter
TASK-00018
Questionnaire SaaS validation — synthesize + go/no-go gate
backlogP1
owner: valter
TASK-00019
90-day validate-to-ship campaign (LinkedIn concierge)
backlogP1
owner: valter
TASK-00020
Vibe-to-Prod define offer scope and pricing
backlogP1
TASK-00021
Vibe-to-Prod landing page and design-partner offer
backlogP1
TASK-00022
Vibe-to-Prod distribution outreach to founders and dev shops
backlogP2
TASK-00023
Vibe-to-Prod concierge-deliver 3–5 paid design partners
backlogP2
TASK-00024
Vibe-to-Prod week-4 gate: decide productize or pivot
backlogP2
Done (9)
TASK-00001
Drive adb L100 lifecycle end to end
doneP1
owner: valter
TASK-00003
Fix task.created event payload + docs schedule name
doneP1
owner: valter
TASK-00004
Add problem-statement + target-customer worksheets to validation pack
doneP1
owner: valter
TASK-00006
Windows: adb task resume cannot launch Claude
doneP1
owner: valter · ai-dev-brain
TASK-00007
F1 cross-process lock on backlog.yaml
doneP1
ai-dev-brain
TASK-00008
F2 fix worktree event metric and config bugs
doneP1
ai-dev-brain · worktree ahead 3 (unmerged)
TASK-00009
FIFO SaaS validation: competitor recon (DrilLedger + portals)
doneP1
owner: valter
TASK-00015
Questionnaire SaaS validation — competitor recon
doneP1
owner: valter
TASK-00025
Harden ai-research study agent against lost learning on failed/timed-out study
doneP2

Sources & caveats

Fact sources this run: adb task status --json (25 tasks, authoritative) ✓ · adb status --json cross-repo git (3 repo-backed) ✓ · adb alerts (5) ✓ · adb events 14d (sampled) ✓ · adb initiative list (1) ✓ · per-ticket status.yamlunavailable (none present for active tickets, so no per-ticket progress bars).

Counts and ticket state are derived from adb, not memory. The status distribution (44/12/8/36%) and org rollups reconcile to the 25-task list; the backlog count (11) matches the adb backlog-size alert.