Directive: "you are my ai dev brain — check reports/, the tickets, the wiki, and fan out subagents to work on all the tickets." I audited the adb board (65 tickets), found the ListVouch content-agency validation backlog was ~80% already built by prior sessions, and fanned out 8 background agents scoped to verify-then-deepen + genuinely-open builds + prep under hard prep-only guardrails (no sends/posts/payments/purchases/infra-mutation, no git commits).
All 8 agents completed. Net result: the ListVouch venture is now prep-complete and execution-gated — every buildable ticket is at done-quality, and what remains is a short list of real-world actions only Valter can take (Higgsfield top-up, account setup, domain, live-portal refresh, the actual sends). The adb board moved from 3 → 9 tickets in review.
./repos, so agent files inside the content-agency sub-repo are sourced from the agents' own completion reports (each named the exact path it wrote).reports/ + wiki/; sampled the content-agency repo → found the backlog largely built, brand name locked to "ListVouch".review; promoted the open ones to in_progress; registered the session on wiki/live.md./session-report (job 270e2013, every 10 min) — produced rolling snapshots at 19:19 and 19:21.| File | What it is |
|---|---|
| reports/fleet-cicd-audit.md | Read-only fleet CI/CD audit — coverage 0/19, pilot status, top-3 next PRs (TASK-00055). |
| tools/clip/content-calendar-2wk.md | 14-day TikTok-first content calendar + 12 seeds (TASK-00056). |
| CDP-BROWSER-SETUP.md | Persistent logged-in CDP browser runbook — social/:9226 profile (TASK-00059). |
| listvouch-baseline.png | Playwright render baseline of the ListVouch site (TASK-00045). |
— inside the pruned content-agency sub-repo (paths per agent reports) — | |
tracking/prospects.csv · tracking/photographers.md | 34 real Perth agents + 10 photographer studios (TASK-00038). |
docs/g1-gate.md | G1 first-cash go/no-go gate — fillable, un-run pending data (TASK-00051). |
docs/setup-checklist.md | <60-min ops runbook: Tally + Stripe + Pixieset (TASK-00046). |
docs/outreach-batch-ready.md | Send-ready proof-first outreach kit — templates, merge fields, follow-ups (TASK-00047). |
| File | Change |
|---|---|
wiki/live.md | Fan-out session registered, then closed out with all 8 outcomes. |
reports/index.html | CEO dashboard reindexed (38 reports) to include fan-out reports + the CI/CD audit. |
tracking/funnel-tracker.csv (sub-repo) | Added cost_aud/intent + targets + rollup + snapshots (TASK-00036). |
tracking/README.md (sub-repo) | Synced column list to the CSV (I closed tracker-gate's flag). |
brand/index.html · brand/styles.css | ListVouch site finalized: live CTAs, WCAG-AA contrast, OG meta, favicon, clean console (TASK-00045). |
docs/intake-form.md · docs/ops-stack.md | Gaps closed + verified against the tested pipeline (TASK-00046). |
tools/omnictx-cdp/*.ps1 · Taskfile.yml | Added social profile + keepalive + task targets (TASK-00059). |
| Task | Outcome | Status |
|---|---|---|
| 00036 funnel tracker | verified + fixed, Sheets-ready | review |
| 00037 channel/ICP recon | done-quality (prior), accepted-pending | review |
| 00039 competitor teardown | done-quality (prior), accepted-pending | review |
| 00045 ListVouch site | finalized, Playwright-verified | review |
| 00046 ops stack | checklist + verified dry-run | review |
| 00038 prospect list | 34 agents + 10 photographers (partial) | in_progress |
| 00051 G1 gate | framework built, un-run | in_progress |
| 00055 fleet CI/CD | audit done, rollout 0% | in_progress |
| 00056 content cadence | calendar + seeds built | in_progress |
| 00059 CDP browser | designed + scripted + documented | in_progress |
| 00044 proof portfolio | needs Higgsfield credit top-up | blocked |
| 00047 outreach launch | kit prepped; needs prospects + proofs | blocked |
| 00061 / 00062 / 00063 / 00064 | done, awaiting Valter sign-off | review |
INTAKE_FORM_URL in the site.Fact sources used this run: git adb mtime scan gstack timeline transcript 8 agent completion reports.