This report is labeled to TASK-00010 (FIFO SaaS validation — the 8–10 WA-mining-subcontractor ICP interviews), but it is built almost entirely from git working-tree state + an mtime scan + adb, because there is little direct conversational context for this session — it opened with the /session-report command — and the transcript picked by recency belongs to a different, concurrent session (a gource "AI-dev-brain synapse animation" / Obsidian question). Treat that transcript as noise here.
What the live workspace actually shows is a broad validate-first venture-portfolio push dated 2026-07-14 / 07-15, not fresh TASK-00010 interview artifacts. Concretely, from git: TASK-00010 was promoted backlog → in_progress (2026-07-14); the parallel Questionnaire-SaaS line gained a decided "micro-teardown" outreach demo kit; a new Vibe-to-Prod venture was scaffolded as five tickets (TASK-00020–00024); ADR 0003 was accepted; DEBT-0002 was logged; TASK-00025 was closed; and a Higgsfield referral ticket (TASK-00026) was opened. TASK-00010's own Phase-0 call kit was committed in earlier sessions (see the recent commit log), so it is not in this uncommitted set.
Recap reflects available context + git facts; a long/compacted session may omit earlier steps, and the working-tree changes here span more tickets than TASK-00010 alone. File lists are derived from git + the mtime scan, not memory.
Timeline
Reconstructed from adb updated timestamps + file mtimes — not a live session trace (the gstack timeline held only one entry, plan-ceo-review completed 2026-07-13). Order is approximate.
2026-07-14 ~09:10 — TASK-00010 flipped backlog → in_progress in backlog.yaml (the FIFO interview spike goes active).
2026-07-14 ~09:21 — ADR 0003 authored and registered in adr/index.yaml (agent-driven large-change doctrine).
2026-07-14 ~09:15–09:19 — TASK-00025 created and closed (done): harden the ai-research study agent against lost learning on failed/timed-out runs.
2026-07-15 (concurrent, other session[s]) — gource "brain" animation render, Higgsfield content-factory wiki ingest, TikTok harvest, CEO dashboard/reports regen — visible only via the mtime scan; not this TASK-00010 session.
New Nygard-format ADR (status accepted): agent-driven large changes must go understand-first → behavior-equivalence harness → pilot-first, then fan out in dependency-aware batches behind a circuit breaker. Distilled from Anthropic's code-modernization plugin + OpenAI Codex's intent-override.
TASK-00016/knowledge/demo-kit.md
The decided outreach lead artifact for the Questionnaire-SaaS line: a personalized 2-question "micro-teardown" (cited, AU-native, framed as a diagnostic) + a 20–30 min build runbook + 3 fully-worked examples (Azupay, Data Zoo, Consultmed) with draft my-imagination-ai messages. Explicitly marked "nothing sent."
TASK-00020/ … TASK-00024/
Five new Vibe-to-Prod venture tickets (scaffolded, mostly empty design bodies): offer scope & pricing, landing page + design-partner offer, distribution outreach, concierge-deliver 3–5 paid partners, week-4 productize/pivot gate.
TASK-00025/
Ticket for hardening the ai-research study agent against lost learning on failed/timed-out studies — created and closed done the same day.
TASK-00026/
New ticket + design/notes/context/decisions: a Higgsfield referral campaign to make the Ultra plan self-funding via honest referrals.
Other recent workspace artifacts (mtime scan — attributable to concurrent session[s], not TASK-00010)
Surfaced by the 8-hour mtime scan; git can't see most of these. Listed for completeness, not claimed as this session's work.
+20 lines: addendum recording a second /small-council pass (buyer-truth refinements grafted onto the gates; grants/tenders verdict unchanged).
TASK-00016/design.md
+2 lines: link to the new demo-kit.md as the outreach lead artifact.
TASK-00019/design.md
Week-1 step now points at the decided demo format (demo-kit.md).
Key decisions
ADR 0003 accepted — agent-driven large changes (3+ non-trivial files or 2+ targets) follow understand-first → behavior-equivalence harness → pilot-first → dependency-aware fan-out behind a circuit breaker, human-gated and intent-honoring. Why: behavior drift is the top risk of AI refactors and must be proven absent, not assumed; a bad transform should die on one pilot, not replicate across N.
Questionnaire-SaaS outreach lead = personalized 2-question "micro-teardown" under the my-imagination-ai brand (small-council, unanimous). Why: defensible depth beats breadth; a cited, AU-native diagnostic reads as "this person knows my world," and a wrong guess converts to a conversation rather than a miss. It's the free-teardown ladder's first rung.
90-day plan — 2nd small-council pass → Option C "buyer-truth refinement" (jury 2–1). Why: sharpen Gate 2 into a repeat-purchase test (the 2nd paid cheque is the real willingness-to-pay signal for an episodic buyer), add a ~10-day credibility warm-up before cold outreach, and run a parallel listen-only applicant track from Day 1. The grants/tenders → grant-writers verdict from the earlier 5/5 pass stands.
DEBT-0002 logged instead of chasing local accel — vLLM / speculative-decoding / NVFP4 need CUDA/ROCm; this box is Intel Arc + CPU Ollama (~3 tok/s). Why: stay Ollama/CPU for batch, hosted APIs for quality; revisit on a CUDA/ROCm GPU or cloud burst.
Tasks
From adb task status at report time. TASK-00010 is the labeled focus.
State discrepancy worth fixing: TASK-00010's per-ticket status.yaml still reads status: backlog (updated 2026-07-10), while the central backlog.yaml and adb task status both report in_progress (updated 2026-07-14). The serializer/state are out of sync for this ticket.
[feat] Higgsfield referral campaign — self-funding Ultra plan · P2
backlog (new)
TASK-00025
[fix] Harden ai-research study agent against lost learning · P2
done (new+closed)
Board totals at report time: 3 in_progress · 2 blocked · 12 backlog · 9 done. Also DONE this line: TASK-00009 (FIFO competitor recon), TASK-00015 (Questionnaire competitor recon).
Sources & caveats
Fact sources used this run:
git ✓mtime scan ✓adb ✓gstack — thin (1 entry, 2 days old)transcript — present but a DIFFERENT concurrent session.
No commits in the last 8 hours — all facts are from the working tree + mtime, not fresh commits. TASK-00010's Phase-0 call kit (ICP list, one-pager, size-checked call order) was committed in earlier sessions (commits 80ce869, adad6e8), so it is not in this uncommitted diff.
Transcript mismatch: the recency-picked transcript is the gource/Obsidian "brain animation" session — unrelated to TASK-00010. It was not used to write this narrative.
Scope: the label is TASK-00010, but the live working-tree changes are broader (Questionnaire-SaaS, Vibe-to-Prod, Higgsfield, ADR/debt). Reported as-found rather than force-fit to the label.
Recap reflects available context + git facts; a long/compacted session may omit earlier steps. File lists are derived from git + the mtime scan, not memory.