2026-07-14 · repo C:/Users/valte/Code/valter · branch main · session fifo-saas-discovery-calls
Summary
This session pressure-tested a niche B2B micro-SaaS idea — a subcontractor-side tool that packages FIFO-worker compliance docs and pushes them into Tier-1 WA-mining contractor portals (Avetta/ISNetworld/Cm3/BHP Enable). It began with a CEO/founder-mode review of a research doc, which found the idea was effectively a clone of an existing product (DrilLedger) built on that competitor's own marketing numbers. Across three /small-council votes and two desk-research passes the work converged on a validate-before-build 90-day plan: direct-ICP outreach as the backbone, LinkedIn demoted to a parallel (Nina-run) distribution layer, and the build phase gated on a real paid signal.
Everything durable was written to the wiki + adb tickets and committed; a Nina social seed was prepared (not sent), and a handoff doc was written. The plan now rests on one human action Claude can't take: Valter's discovery calls.
This repo is shared by several concurrent Claude sessions. Git status & the mtime scan are dominated by other sessions' work (vibe-to-prod, questionnaire-SaaS, ai-research, Live Shop, clipping) — this report covers only the FIFO thread and excludes the rest.
Timeline
CEO review (plan-ceo-review) of raw/research/AI Solo Founder Problem Guide.md → verdict validate-first; flagged it as a DrilLedger clone on competitor-sourced numbers. Produced an HTML review.
Filed business research (wiki source + living topic) and minted validation tickets TASK-00009–00012; committed both repos. Saved a Claude memory + filed TASK-00013 for a discovered adb bug.
Phase-0 prep ("proceed") → built a ~40-company ICP prospect list + one-pager into TASK-00010, then size-checked the top 11 (Ranger Drilling + Topdrill confirmed 50–200).
Handoff doc written to OS temp; this session report generated.
Ordering is from session narrative; the gstack timeline confirms one plan-ceo-review completion but is otherwise thin.
Artifacts produced
This session's own artifacts (verified on disk / in the mtime scan). Multi-day session — some were created on earlier days and so fall outside the gatherer's 8h/480min windows; each is still a real file you can open.
Added FIFO topic + source links under valter-silva-au. mtime ✓
backlog.yaml
adb task statuses for TASK-00009→done / 00010→in_progress / 00011→blocked. shared file — also carries other sessions' rows; left uncommitted by this session
tickets/…/TASK-00009,10 status.yaml
Quoted colon-containing titles so check-yaml passes (the adb bug workaround).
Key decisions
Validate before building — the idea is a clone of a live product on unverified, competitor-sourced numbers; cheapest high-info move is validation, not code. plan-ceo-review
Council #1 → continue, hard-time-boxed (3–0) — a live competitor proves a market exists; run a cheap probe, don't build; concierge MVP gated.
Council #2 → continue to founder-led calls (3–0) — recon killed the desk disqualifiers (incumbent is a pre-launch solo peer; wedge open); only demand is left to test.
Council #3 → direct-ICP-led 90-day plan (consensus) — the buyer isn't on LinkedIn and clicks aren't commitment; LinkedIn demoted to a Nina distribution layer with zero gate authority; build conditional on a paid signal.
Nina seed prepared, not sent — de-identified build-in-public; posting needs Valter's approval and the bots MCP is read-only + unloaded.
Tasks (adb)
This session's tickets only. adb also lists TASK-00014–00025 — those belong to other concurrent sessions (questionnaire-SaaS, vibe-to-prod, ai-research) and are excluded here.
TASK-00013 — adb: quote title in status.yaml serializer
backlog — filed this session
Commits (this session)
Verified hashes; only the last two fall inside the gatherer's "8 hours ago" window (multi-day session).
Repo
Commits (oldest → newest)
parent
eb486d1 · 980be57 · eb04f15 · adad6e8 · 80ce869
wiki
28a5f3f · 4f55615 · 0e8a233
Sources & caveats
Fact sources used this run: gitadb taskstranscript (4.5 MB, this session)gstack timeline (thin — 1 entry).
Recap reflects available context + git facts; a long/compacted, multi-day session may omit earlier steps. File lists are derived from git + the mtime scan, not memory. Critically, this repo is edited by multiple concurrent sessions — the raw git/mtime output is dominated by non-FIFO work (vibe-to-prod, questionnaire-SaaS, ai-research digests, Live Shop, clipping); those files are deliberately excluded here because they are not this session's. backlog.yaml is shared and was intentionally left uncommitted.